Need a fast quote?

Quality, Certificates & Documents

Sourced from audited partner mills with EN 10204 3.1 and 3.2 certificates, third-party inspection on request, and heat-number traceability from mill certificate to packing list.

Quality management

ALLOYTI applies a disciplined quality process on every order. EN 10204 3.1 Third-party inspection Every order follows the same sequence: specification confirmed in writing, material identified by heat number, inspection performed to the agreed scope, and documents issued before dispatch.

Order workflow

  1. Requirement confirmation — grade, standard, dimensions, quantity, service conditions and target delivery.
  2. Production planning — availability, route (hot rolling, forging, machining) and any special requirements confirmed.
  3. Documents and inspection — certificate type, inspection scope and any third-party witness agreed in advance.
  4. Delivery follow-up — packing, marking, inspection, dispatch and shipping documents tracked to closure.

Inspection scope

ItemWhat it coversWhen it applies
Chemical compositionHeat analysis against the grade specificationEvery order, on the mill certificate
Mechanical propertiesTensile, yield and elongation to the applicable standardEvery order, on the mill certificate
Dimensional inspectionDiameter, thickness, length, straightness and tolerancesBefore packing
Surface inspectionCracks, laps, scratches and finish conditionBefore packing
Non-destructive testingUltrasonic (UT) and penetrant (PT) testingWhen required by standard or your specification
Third-party inspectionIndependent witness and reportingBy agreement, defined in the order

Documents

  • EN 10204 3.1 — mill test certificate, issued as standard.
  • EN 10204 3.2 — countersigned certificate, on agreement.
  • Third-party inspection report — when arranged.
  • Packing list and commercial invoice — with grade, heat number and order reference.
  • Certificate of origin and other destination-specific documents — confirmed before dispatch.

For customs purposes titanium and articles of titanium are generally classified under HS heading 8108; we confirm the exact code for your destination with the shipment documents.

Quality systems & compliance

The mills we work with operate independently audited quality management systems. The certificates referenced below belong to those mills, not to ALLOYTI. For each order we confirm the current scope, validity and product coverage of the specific mill before committing.

ISO 9001 — Quality management

Our partner mills maintain ISO 9001-certified quality management systems covering melting, rolling, forging and inspection. We match the certificate scope to the product form and grade in your enquiry.

AS9100 — Aerospace quality

For aerospace applications, material can be sourced from mills holding AS9100 certification, with the traceability and test reporting that entails. Availability is confirmed per order; we do not assume that one mill covers every product form.

PED 2014/68/EU — Pressure equipment

PED is an EU directive governing pressure equipment, not a company certificate. For EU pressure applications we provide the material documentation supporting the equipment manufacturer's conformity assessment: EN 10204 3.1 or 3.2 certificates, heat-number traceability and testing to the applicable standard. The equipment-level conformity assessment remains with the equipment manufacturer.

Copies of current mill certificates and their scopes are available on request; we verify them against the order before dispatch.

Traceability

Material is identified by heat number from mill certificate through to packing list, so any delivered piece can be traced back to its heat and inspection record. Marking method and identification rules are agreed with the order.

Which certificates are issued with an order?

Mill test certificates to EN 10204 3.1 are issued as standard, covering chemical composition, mechanical properties and heat-number traceability. EN 10204 3.2 certificates countersigned by an independent inspector, and third-party inspection, can be arranged when agreed in the order.

Can you arrange third-party inspection before shipment?

Yes. Independent inspection (for example SGS, TÜV or Bureau Veritas) can be arranged by agreement, with the scope — dimensional, visual, UT, PT or witness testing — defined before production starts.

How are titanium shipments packed and identified?

Material is packed to prevent contact damage and contamination, marked with grade, heat number, size and order reference, and shipped with packing list and commercial invoice. Export documents required at destination are confirmed before dispatch.

Need a quote for titanium?

Send the product form, grade, dimensions and destination — we confirm availability, standards and documents before you commit.

Request a Quotation